Category: Design & Construct

Road Rehabilitation – Kilcoy

Road Rehabilitation – Kilcoy

Joe Wagner Group was appointed principal contractor to design and construct the rehabilitation of 600m of severely degraded road and entrance-way asphalt at the Kilcoy Water Treatment Plant. Works included: Carrying out a Geotechnical assessment of the existing road to determine the most efficient solution to the failed road; Tyning up and recompacting the gravel […]

Carpark – Harristown High School

Carpark – Harristown High School

Joe Wagner Group was appointed principal contractor for the construction of a new staff carpark. Works included: Bulk earthworks and subgrade treatment Unbound pavements Installation of pre-cast concrete drainage pipes and structures Cast in-situ concrete works including footpath and crossover pavement Design and construct of a retaining wall and 3.5m high fencing attached to the […]