Category: Drainage

Oakey Service Station

Oakey Service Station

Earthworks, drainage, pavement, and surfacing works for the intersection upgrade and to facilitate heavy vehicle manoeuvres entering and exiting the new service station at the intersection with the Warrego Highway. WORKS INCLUDED As Principal Contractor, JWG were responsible for the safe and timely delivery of all work in accordance with the clients requirements, design details and TMR specification. […]

Sovereign Hill Subdivision Stage 2

Sovereign Hill Subdivision Stage 2

Joe Wagner Group was appointed Principal Contractor for the delivery of this 70-lot subdivision. Works included: Excavation and site clearing Installation of Stormwater drainage Installation of sewerage services and water supply Installation of conduit for electricals and NBN Multi-layer granular pavements Hot-mix asphalt pavement Installation of kerb and channel, road furniture, street lighting and linemarking […]

QAS Early Civil Works

QAS Early Civil Works

Joe Wagner Group was appointed principal contractor for the early civil works required for a new Ambulance Station and LASN office being constructed on the intersection of a busy connection road in South Toowoomba. This required an intersection upgrade including road widening and realignment involving one main thoroughfare and two residential streets. Works included: Earthworks […]

Jilalan WOF Drainage

Jilalan WOF Drainage

Joe Wagner Group was contracted to provide the civil drainage works for an upgrade of the Jilalan Wagon Overhaul Facility at Sarina. Works included: Laying of subgrade and geofabric Installation of precast concrete pipes and culverts (600mm t0 1200mm) Installation of precast headwalls and pits Construction of concrete aprons for culvert outlets including rat walls […]

Stormwater, North Burnett Region

Stormwater, North Burnett Region

Joe Wagner Group was contracted to install stormwater drainage for a detour side-track that was needed to divert traffic during an upgrade of the Burnett Highway. Works included: Excavation Installation of concrete and steel pipe culverts from 900mm to 2400mm Installation of pre-cast concrete headwalls and end structures The laying of Geofabric and rock protection […]

Stormwater: New Youth Detention Centre, Wacol

Stormwater: New Youth Detention Centre, Wacol

Joe Wagner Group was contracted to deliver stormwater drainage as part of the early civil works package for the new Youth Detention Centre at Wacol. Works included: Excavation Installation of all stormwater pipes Construction and installation of pre-cast and in-situ stormwater structures, manholes, field inlets and gully pits Construction of in-situ headwalls Provision of skilled […]

Newell Highway Upgrade, NSW

Newell Highway Upgrade, NSW

Joe Wagner Group constructed drainage works on the Newell Highway Upgrade from Mungle Back Creek to Boggabilla. The project stretched over 18.4 kilometres and continued a very strong relationship with our client. Works included: Cast in-situ base slabs for reinforced concrete box culverts with recesses Installation of reinforced concrete pipes and reinforced concrete box culverts […]

Culvert Renewal North Coast Line

Culvert Renewal North Coast Line

Joe Wagner Group successfully tendered for the replacement of culvert systems on two sites along the North Coast Line near Bundaberg. Works included: Site establishment and survey Excavation Site preparation for pipe-jacking rig Pipe-jacking of new culvert system under the railway line The building of cast-in-situ headwalls Spreading of spoil material on site Due to […]

Toowoomba Second Range Crossing – Drainage

Toowoomba Second Range Crossing – Drainage

Joe Wagner Group was engaged to deliver drainage works across the Second Range Crossing project. This included the provision of plant, labour and supervision. Works included: Approximately 10km of reinforced concrete pipe culverts from 375 to 2100 diameter Large-scale drainage structures such as double and triple cell 2100 dia. pipes, six-cell 1500 pipes and many […]

Western Culverts Replacement

Western Culverts Replacement

Queensland Rail appointed Joe Wagner Group to replace deteriorated culverts ranging from single-celled to eight-celled culverts over eight sites. Works included: Removal of railway track Demolition of existing, damaged culverts Excavation of site in preparation for new culverts Laying of geofabric where necessary Positioning new prefabricated culverts Placement of concrete headwalls Backfilling and replacing the […]