Category: Drainage

Gore Highway Widening

Gore Highway Widening

Due to the construction of new facilities, the Queensland Truck Centre approacehd Joe Wagner Group to improve access and alleviate traffic congestion on the Gore Highway at the entrance to their site. This was a Brownfield project that required close liaison with the client, designers, DTMR and Toowoomba Regional Council. Works included: Removal of existing […]

Pipe and Cross-Road Culvert Installation

Pipe and Cross-Road Culvert Installation

Joe Wagner Group is a member of RoadTek’s panel of contractors to provide Concrete Placement and Drainage for Queensland roads. We were invited to tender for the Burnett Highway project and were appointed Principal Contractor. Works included: Demolition and removal of old complete culverts Demolition and removal of culvert end structures Excavation Extension of 14 […]

NDRRA Flood Repairs – Banana Shire

NDRRA Flood Repairs – Banana Shire

Joe Wagner Group were contracted to carry out flood repairs on 135 different road drainage structures along the Leichhardt Highway and eight other sites around the Banana region. Works included: Removal of sediment and small debris from culverts and bridges Repair of longitudinal drainage Supply and installation of geotextile General earthworks Installation of concrete kerb […]

Stormwater Works Warrego Highway

Stormwater Works Warrego Highway

Joe Wagner Group was engaged to install more than 3km of underground stormwater infrastructure as part of the $44 million upgrade of the Warrego Highway at Charlton. Works included: Installation of more than 2.5km of various sized reinforced concrete pipe Over 500m of various sized reinforced concrete box culverts Excavation works from 0.5 to 6.5 […]

Fisher Park Heavy Vehicle Rest Area

Fisher Park Heavy Vehicle Rest Area

The Fisher Park Heavy Vehicle Rest Area project included the construction of a new hardstand area adjacent to the Cunningham Highway near Maryvale. Works included: Widening and upgrading of the Cunningham Highway Construction of new drainage structures and extension of existing drainage structures Construction of the new rest area, including earthworks, pavements and surfacing Soil […]

Gabion Baskets – Dawson River

Gabion Baskets – Dawson River

Joe Wagner Group was appointed by RoadTek to provide supervision, plant and operators for batter trimming between Rolleston and Roma. A significant portion of this project involved the construction of gabion baskets and rock mattresses at Dawson River and Dawson River Overflow crossings. Works included: Site establishment The construction of 9 gabion structures ranging from […]