Newell Highway Upgrade, Boggabilla

Joe Wagner Group was contracted by Fulton Hogan to deliver a drainage package for the Newell Highway Upgrade on an 18.4 km stretch from Mungle Back Creek to Boggabilla in NSW. Previous Next Work commenced in November 2018 with our crews working on multiple concurrent sites pouring cast in-situ recessed culvert bases and laying pipes. […]

Introducing the HiPer VR

The Topcon HiPer VR GNSS receiver is the latest technology in GPS machine control. It receives signals from ALL satellite systems in orbit making it extremely accurate. It also has a tilt-sensor which means that when doing survey stake-out work, if the unit is tilted, it still gives a plum position as if it is […]

The Falkirk Wheel, Scotland

With the rehabilitation of canals in Scotland, a solution was needed to move boats from one canal to another since many of the old locks had been filled in and built over. This amazing piece of machinery does the job well. https://joewagnergroup.com.au/wp-content/uploads/2020/01/Archimedes_and_a_Boat_Lift__the_Falkirk_Wheel.mp4

The Early Days

We have various things planned to celebrate this year, so keep an eye on our LinkedIn page for further information. In the meantime, enjoy a trip down memory lane.  (Click on an image to see a larger photo) *Please note, this gallery is not supported by Microsoft Explorer

A Tale of Two Drainage Jobs

Drainage jobs can look similar on the surface (or in the trenches), but each project comes with its unique challenges. Two of our current drainage jobs are for Decmil on the Warrego Highway at Chinchilla, and Shamrock Civil at Wacol. Vastly different site conditions have required us to take a different approach for each. Previous […]

Plant Attachments

We have a variety of attachments to go with our plant. Here’s a sampling of a few: https://youtu.be/rL4pPKu_Aw4 Our Level-Best Grader attachment fits skid steers and allows for precision grading in tight areas. If you need some rock removed, our Hydraulic Rock Breaker attachment can do the job. We have a range of Augers for […]

Improving Erosion and Sediment Control Performance

Improving Erosion and Sediment Control Performance

Joe Wagner Group utilises latest technology to improve environmental performance and reduce costs JWG recently constructed a permanent silt fence for QR within the rail corridor in Toowoomba. The specifications for this project called for extra heavy duty components to ensure better durability than a standard silt fence. The JWG team utilised a pneumatic staple […]

Our New Depot

Our New Depot

We are enjoying all the extra space that our new depot provides and have grand plans for the development of the site. Our old depot in Parker Street served us well when we were a smaller company, but we simply out-grew the space. Our new depot gives us room to spare with plenty of scope […]

Concrete Canvas

Concrete Canvas

We recently completed a slope stabilisation for RoadTek using Concrete Canvas. Location: Warrego Highway outside of Roma Existing grass batters had deteriorated and needed to be replaced. We first scoured the old batters and dug a trench along the top of the slopes. The concrete canvas sheeting was pinned into the trenches at the top […]