Silt fencing

Improving Erosion and Sediment Control Performance

Joe Wagner Group utilises latest technology to improve environmental performance and reduce costs

JWG recently constructed a permanent silt fence for QR within the rail corridor in Toowoomba. The specifications for this project called for extra heavy duty components to ensure better durability than a standard silt fence. The JWG team utilised a pneumatic staple gun and purpose built silt fence installing machine to ensure a very fast, efficient and high quality result. The Vermeer silt fence installer is much faster and less labour intensive than conventional methods and demonstrates our commitment to improving environmental performance on our projects.