Joe Wagner Group was appointed Principal Contractor for the delivery of this 70-lot subdivision.
Works included:
- Excavation and site clearing
- Installation of Stormwater drainage
- Installation of sewerage services and water supply
- Installation of conduit for electricals and NBN
- Multi-layer granular pavements
- Hot-mix asphalt pavement
- Installation of kerb and channel, road furniture, street lighting and linemarking
- Installation of retaining walls with subsoil drainage
- Landscaping
This project had a very tight time-frame for practical completion which required extensive planning and resourcing to achieve. Close liaison with the client, design engineers and Toowoomba Regional Council was also required.
The project met our client’s budget and time-frame with no LTIs.