Joe Wagner Group was contracted to deliver stormwater drainage as part of the early civil works package for the new Youth Detention Centre at Wacol.
Works included:
- Excavation
- Installation of all stormwater pipes
- Construction and installation of pre-cast and in-situ stormwater structures, manholes, field inlets and gully pits
- Construction of in-situ headwalls
- Provision of skilled labour and plant hire
Extremely rocky ground made this job particularly challenging and required the employment of our rockbreaker to excavate the drainage pits and channels.
Many other subcontractors working on the project made for a very busy worksite. This necessitated excellent communication and meticulous daily planning.
The contract was completed on time with no LTIs.