Joe Wagner Group was contracted to install stormwater drainage for a detour side-track that was needed to divert traffic during an upgrade of the Burnett Highway.
Works included:
- Excavation
- Installation of concrete and steel pipe culverts from 900mm to 2400mm
- Installation of pre-cast concrete headwalls and end structures
- The laying of Geofabric and rock protection where required
As this work took place in a remote location with no nearby infrastructure, extensive pre-planning and mobilisation was required.
The job was completed on time with no LTIs, and the client was very pleased with our work.