Joe Wagner Group was contracted by Fulton Hogan to supply plant-hire, labour and supervision for the replacement of timber bridges at four sites on the North Coast Railway line. This is part of a wider Queensland Rail program to replace timber rail bridges with steel and concrete structures across their network.
Works included:
- Demolition of existing bridges
- Bulk excavation works
- Survey and model design for bridge abutments
- Provision of up to 34 staff for 24/7 schedules and two rail shutdowns
Our involvement in this project started in December 2018 and is ongoing.