Category: Roadworks

Jubilee Park Fire Trails

Jubilee Park Fire Trails

Joe Wagner Group was contracted to deliver the trail formation and sheeting works on the Harvey Street-Amos Road fire trail in one of Toowoomba’s largest natural bushland reserves. This was in order to provide a low-maintenance vehicle trail to improve the function and safety of use for Council maintenance and fire-fighting vehicles in all weather. […]

Sovereign Hill Subdivision Stage 2

Sovereign Hill Subdivision Stage 2

Joe Wagner Group was appointed Principal Contractor for the delivery of this 70-lot subdivision. Works included: Excavation and site clearing Installation of Stormwater drainage Installation of sewerage services and water supply Installation of conduit for electricals and NBN Multi-layer granular pavements Hot-mix asphalt pavement Installation of kerb and channel, road furniture, street lighting and linemarking […]

QAS Early Civil Works

QAS Early Civil Works

Joe Wagner Group was appointed principal contractor for the early civil works required for a new Ambulance Station and LASN office being constructed on the intersection of a busy connection road in South Toowoomba. This required an intersection upgrade including road widening and realignment involving one main thoroughfare and two residential streets. Works included: Earthworks […]

Baillie Henderson Hospital Carparks

Baillie Henderson Hospital Carparks

Joe Wagner group was appointed Principal Contractor to build two new carparks on the Baillie Henderson Hospital campus. Works included: Removal of trees and site preparation Excavation and removal of top-soil Installation of retaining walls Installation of drains and kerbing Placement of compact pavement layers and asphalt Provision of road furniture, electrical services and line […]

Slope Stabilisation – Roma

Slope Stabilisation – Roma

Joe Wagner Group was engaged to repair batters that had experienced erosion and environmental degradation using Concrete Canvas. Works included: Trimming scoured batters Trenching at top of slope Installation of 2,400m concrete canvas over a 250m stretch of highway We utilised new technology for this project, employing concrete canvas which allowed us to install the […]

Road Rehabilitation – Kilcoy

Road Rehabilitation – Kilcoy

Joe Wagner Group was appointed principal contractor to design and construct the rehabilitation of 600m of severely degraded road and entrance-way asphalt at the Kilcoy Water Treatment Plant. Works included: Carrying out a Geotechnical assessment of the existing road to determine the most efficient solution to the failed road; Tyning up and recompacting the gravel […]

Carpark – Harristown High School

Carpark – Harristown High School

Joe Wagner Group was appointed principal contractor for the construction of a new staff carpark. Works included: Bulk earthworks and subgrade treatment Unbound pavements Installation of pre-cast concrete drainage pipes and structures Cast in-situ concrete works including footpath and crossover pavement Design and construct of a retaining wall and 3.5m high fencing attached to the […]

NDRRA Flood Restoration Works – SDRC

NDRRA Flood Restoration Works – SDRC

The Southern Downs Regional Council sustained significant damage to their unsealed road network from ex-Tropical Cyclone Debbie in 2017. Joe Wagner Group delivered a competitively tendered package of works across 34 roads in the North East of the Council area. Works included: 27 Kilometres of heavy grading, incorporating 5,700m3 of gravel top across this area […]

Gore Highway Widening

Gore Highway Widening

Due to the construction of new facilities, the Queensland Truck Centre approacehd Joe Wagner Group to improve access and alleviate traffic congestion on the Gore Highway at the entrance to their site. This was a Brownfield project that required close liaison with the client, designers, DTMR and Toowoomba Regional Council. Works included: Removal of existing […]

Warrego Highway Upgrade

Warrego Highway Upgrade

Joe Wagner Group was appointed principal contractor for the Warrego Highway widening and the reconstruction of Butlers Road, Haigslea. The upgrade was associated with the construction of a new BP Service Centre. Works included: Over 1km of DTMR spec pavement reconstruction 10,000m3 of material removed from site Stormwater and electrical service installation Under boring Asphalt […]

NDRRA Flood Repairs – Banana Shire

NDRRA Flood Repairs – Banana Shire

Joe Wagner Group were contracted to carry out flood repairs on 135 different road drainage structures along the Leichhardt Highway and eight other sites around the Banana region. Works included: Removal of sediment and small debris from culverts and bridges Repair of longitudinal drainage Supply and installation of geotextile General earthworks Installation of concrete kerb […]

Stormwater Works Warrego Highway

Stormwater Works Warrego Highway

Joe Wagner Group was engaged to install more than 3km of underground stormwater infrastructure as part of the $44 million upgrade of the Warrego Highway at Charlton. Works included: Installation of more than 2.5km of various sized reinforced concrete pipe Over 500m of various sized reinforced concrete box culverts Excavation works from 0.5 to 6.5 […]